Ground Water Study

On Monday, November 2, 2021, the Town of Happy Valley-Goose Bay held a public consultation on the Groundwater situation affecting residents on Rendell Crescent and

On Monday, November 2, 2021, the Town of Happy Valley-Goose Bay held a public consultation on the Groundwater situation affecting residents on Rendell Crescent and Mitchell Street. Those in attendance included affected residents, members of the general public, and the 13th Council of the Town of Happy Valley-Goose Bay.

The Town’s Municipal Engineer Randy Dillon offered those in attendance the following presentation:

Town HVGB Groundwater Storm Drainage Presentation-November 2021

 

 

 

 

 

 

 

The below link is in relation to the June 2021 study completed by CBCL.

2021 Ground Water Study – CBCL

The below link references the 2012 Land Use Suitability Assessment and Design Concepts.

2012 Land Suitability Assessment and Design Concepts – CBCL